What are entry and exit criteria in testing?

ProcessJunior

In shortEntry criteria are the conditions that must be true before testing starts (for example, a stable build is deployed); exit criteria define when testing is done enough to stop or release (for example, no open critical bugs).

Model answer

Entry criteria: can we start testing?

Examples:

  • The build is deployed to the test environment and the smoke test passes.
  • The user story has acceptance criteria and designs.
  • Test data and accounts are ready.
  • Release notes list what changed.

Without them, testers waste time on broken builds or guess what to test.

Exit criteria: can we stop testing and release?

Examples:

  • All planned high-priority test cases were run, with 95%+ passing.
  • No open critical or high-severity bugs; remaining bugs are reviewed and accepted by the product owner.
  • Regression suite run on the agreed devices and browsers.
  • Test summary shared.

Why they matter: they turn “is it ready?” from a feeling into a checklist everyone agreed on earlier. They also protect the team from pressure: if a critical bug is open, the criteria say we’re not done.

Exit criteria never mean “zero bugs”; that’s impossible. They mean the remaining risk is known and accepted.

In agile teams, entry criteria often look like a Definition of Ready, and exit criteria like the Definition of Done for a story or a release checklist.

Learn more: SDLC and STLC

What they're looking for

Clear definitions, realistic examples of each, and an understanding that they make "ready to test" and "done" objective rather than a feeling.

Common mistakes

  • Mixing up entry and exit criteria.
  • Saying testing is done when "all bugs are fixed".
  • Giving vague criteria that can't be checked.